What doesn't fit through the fence, we 'just' lift over it. This 24 meter long bridge part of the Erasmus Bridge has been completely provided with a top coating! Blasting, TSA metalisation and wet painting.
Read the NOS news item here (Dutch).
Brassto B.V.Nieuwland Parc 1683351 LJ PapendrechtThe Netherlands
T: +31 (0) 78 - 890 77 88F: +31 (0) 78 - 890 77 89E: info@brassto.nl
Privacy & AVG
Monday till Fridayfrom 7:30AM till 4:15PM
Saturday and Sundaywe are closed.